PROJECTS

Solar Electric Solutions has completed development and secured construction financing for numerous projects totaling 100 MWdc as detailed in the project list below. (Click on the project links for pictures and further project details.) We have substantial additional projects under development. Contact info@solarelectricsolutions.com for further information.

SEPV Sierra 8.5MW

Size: 8.5 MWac

Location: Lancaster, CA

Off-Taker: Southern California Edison

Status: Construction Ready

COD: 2020

SEPV Sierra is being developed as an Energy Storage System (ESS) where batteries are charged from onsite PV.  First phase of project operational in Q1 2020. Additional phases of the project in 2020 will build out to a planned 17 MWh of battery storage, which is a two hour discharge at this 8.5 MW capacity site. This innovative storage system is being deployed in conjunction with affiliated company, B2U Storage Solutions, Inc, with a superior levelized cost of storage with lower CapEx and OpEx than alternative storage systems. Visit www.b2uco.com to learn more.


Size: 2 MWac

Location: Palmdale, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2017


SEPV Dixieland West (3 MWac) and SEPV Dixieland East (2 MWac)

Total Size: 5 MWac

Location: Imperial County, CA

Off-Taker: Imperial Irrigation District

Status: In Operation

COD: 2016


Size: 20 MWac

Location: Kern County, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2016


Size: 2 MWac

Location: Palmdale, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2015


Size: 12 MWac

Location: Palmdale, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2015


SEPV Boulevard - 5MW

SEPV Boulevard, LLC

Size: 5 MWac

Location: San Diego County, CA

Off-Taker: Southern California Edison

Status: Not Constructed

Forecasted COD: 2015

Pictures unavailable as the project was not constructed by buyer after being sold by SES.


Size: 9 MWac

Location: San Bernardino County, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2013


Size: 12 MWac

Location: San Bernardino County, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2013


Size: 2 MWac

Location: San Bernardino County, CA

Off-Taker: Southern California Edison

Status: In Operation

COD: 2011


Size: 2 MWac

Location: Palmdale, CA

Off-Taker: Southern California Edison

Status: In Operation

Commercial Operation Date (COD): 2011